Craftsman Remodel - Foundation


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0031.JPG
Sat, Oct 9, 2004
DSCN0032.JPG
Sat, Oct 9, 2004
DSCN0033.JPG
Sat, Oct 9, 2004
Root infestation from the date palm tree into the main sewer line. I have no idea how the drains still worked in the house. All of these roots have to be removed by hand prior to foundation form work. Starting to dig outside the living room.
DSCN0034.JPG
Sat, Oct 9, 2004
DSCN0036.JPG
Sat, Oct 9, 2004
DSCN0024.JPG
Thu, Oct 14, 2004
Amy & Chinook in the living room. With the pavers gone, it's time to start digging for the foundation. Starting to prepare the foundation for underpinning.
DSCN0025.JPG
Thu, Oct 14, 2004
DSCN0025.JPG
Thu, Oct 21, 2004
DSCN0026.JPG
Thu, Oct 21, 2004
6-foot deep hole down to the bedrock. That's a lot of dirt in the way. A tarp was put up for our 3" of rain 2 days ago. The date palm tree outside the dining room has A LOT of roots growing along the foundation.
DSCN0001.JPG
Tue, Oct 26, 2004
DSCN0002.JPG
Tue, Oct 26, 2004
DSCN0003.JPG
Tue, Oct 26, 2004
Sealed up for the rain. Forms built every 4 feet for concrete to reinforce and underpin existing foundation. Rebar within each form extends through sides to other forms.
DSCN0004.JPG
Tue, Oct 26, 2004
DSCN0005.JPG
Tue, Oct 26, 2004
DSCN0006.JPG
Tue, Oct 26, 2004
DSCN0007.JPG
Tue, Oct 26, 2004
DSCN0008.JPG
Tue, Oct 26, 2004
DSCN0009.JPG
Tue, Oct 26, 2004
Notice the water sitting in the tarp. The rebar is set up to effectively form a contiguous piece of reinforcement throughout the new concrete.
DSCN0010.JPG
Tue, Oct 26, 2004
DSCN0011.JPG
Tue, Oct 26, 2004
DSCN0012.JPG
Tue, Oct 26, 2004
Joe, the foundation contractor, pours the concrete using a 5-1/2" diameter hose to allow for larger rock pieces to be used. This makes the concrete stronger. The concrete is being poured into the 4 forms in sequence a little at a time until all 4 forms are full. The space between the forms will themselves be poured after this pour dries. The reason is you don't want remove too much dirt from under the foundation at once. Hence, the segmented approach.
DSCN0013.JPG
Tue, Oct 26, 2004
DSCN0014.JPG
Tue, Oct 26, 2004
DSCN0015.JPG
Tue, Oct 26, 2004
DSCN0016.JPG
Tue, Oct 26, 2004
DSCN0017.JPG
Tue, Oct 26, 2004
DSCN0018.JPG
Tue, Oct 26, 2004
Our first cement truck.
DSCN0093.JPG
Sat, Oct 30, 2004
DSCN0094.JPG
Sat, Oct 30, 2004
DSCN0095.JPG
Sat, Oct 30, 2004
The dried concrete. Now the spaces will be formed up and filled to create one massive piece of concrete. See how the rebar sticks out from the sides. With the new concrete the rebar will join these separate pours together.