Craftsman Remodel - Framing page 8


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0039.JPG
Thu, Apr 28, 2005
DSCN0040.JPG
Thu, Apr 28, 2005
DSCN0042.JPG
Thu, Apr 28, 2005
Master bathroom sinks and electrical wires run. See the silver gas pipe? It's going to the fireplace in the master bedroom on the other side of the wall. The light on the right will be inside the steam shower. The bituthane goes over the flashing for a great waterproofing membrane.
DSCN0044.JPG
Sat, Apr 30, 2005
DSCN0045.JPG
Sat, Apr 30, 2005
DSCN0050.JPG
Sat, Apr 30, 2005
One last rain for good measure. Heating duct in the office. See how the roof sections overlap. It looks much better with some stain on it.
DSCN0057.JPG
Sat, Apr 30, 2005
DSCN0058.JPG
Sat, Apr 30, 2005
DSCN0012.JPG
Sun, May 22, 2005
Laundry room plumbing Powder room plumbing All of the phone, coax, and ethernet cables are routed to the garage. They will plug into patch panels here.
DSCN0013.JPG
Sun, May 22, 2005
DSCN0014.JPG
Sun, May 22, 2005
DSCN0015.JPG
Sun, May 22, 2005
The plumbing is for the tankless water heater. The garage electrical sub-panel is one of three. The yellow strings depict the future ceiling beams. The range centerline is right under a joist. The joist will have to be moved to accommodate a 10" vent.
DSCN0016.JPG
Sun, May 22, 2005
DSCN0017.JPG
Sun, May 22, 2005
DSCN0018.JPG
Sun, May 22, 2005
Electrical and plumbing for the range. The range vent will have to pass through where the large drain and central vacuum pipes are currently located.
DSCN0019.JPG
Sun, May 22, 2005
DSCN0023.JPG
Sun, May 22, 2005
DSCN0024.JPG
Sun, May 22, 2005
The rear of the main electrical panel. I just liked this angle. It looks really cool. The ceiling has an interesting shape in here since the ridge is off-center.
DSCN0025.JPG
Sun, May 22, 2005
DSCN0026.JPG
Sun, May 22, 2005
DSCN0027.JPG
Sun, May 22, 2005
A good view of the storage under the stairs. The black pipe is the gas line to the upstairs heating unit. The kitchen is on the other side of this wall.
DSCN0028.JPG
Sun, May 22, 2005
DSCN0029.JPG
Sun, May 22, 2005
DSCN0036.JPG
Fri, May 27, 2005
The upstairs electrical sub-panel. The shower layout prior to moving the body sprays lower.
DSCN0037.JPG
Fri, May 27, 2005
DSCN0038.JPG
Fri, May 27, 2005
DSCN0039.JPG
Fri, May 27, 2005
The central vacuum line will extend out under the cabinet to a toe-kick vacuum opening. Sweep to the end of the cabinet and press a button. The range will go here. The Sub Zero refrigerator will go here. The electrical still has to be put in for it.
DSCN0040.JPG
Fri, May 27, 2005
DSCN0041.JPG
Fri, May 27, 2005
DSCN0042.JPG
Fri, May 27, 2005
Left side of fireplace in living room with gas lines installed to the patio fireplace. This wall had to be firred out to make the living room fireplace symmetrical.



Last updated: 11/13/05