Craftsman Remodel - Landscaping page 2


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

IMG_1842.JPG
Fri, Dec 23, 2005
IMG_1843.JPG
Fri, Dec 23, 2005
IMG_1844.JPG
Fri, Dec 23, 2005
Front yard retaining wall. The corner of the wall will be dug out after the sides are poured. This is to minimize stress on the telephone pole. Ready to pour.
IMG_1849.JPG
Fri, Dec 23, 2005
IMG_1850.JPG
Fri, Dec 23, 2005
IMG_1851.JPG
Fri, Dec 23, 2005
Filling the form for the retaining wall on the north side of the house. That's a big hole to fill. The front part of the retaining wall gets filled.
IMG_1856.JPG
Fri, Dec 23, 2005
IMG_2222.JPG
Wed, Jan 11, 2006
IMG_2223.JPG
Wed, Jan 11, 2006
Still filling. The forms have been removed from the retaining wall. Now the rest of the brick can be removed. The neighbor has a Bird of Paradise that is cracking their retaining wall.
IMG_2284.JPG
Thu, Jan 19, 2006
IMG_2317.JPG
Tue, Feb 7, 2006
IMG_2318.JPG
Tue, Feb 7, 2006
The backyard has been cleaned. The front yard hedge on the north side was removed today. The south-side hedge (actually 4 different trees shaped into a hedge) was removed today.
IMG_2337.JPG
Wed, Feb 15, 2006
IMG_2339.JPG
Wed, Feb 15, 2006
IMG_2340.JPG
Wed, Feb 15, 2006
The water main is put in. It's one massive copper pipe. Water enters the house here. There is 1" pipe throughout the house to keep the volume up. The black pipe is the gas line.
IMG_2363.JPG
Fri, Feb 17, 2006
Pat trims out the window in the garage as the landscapers work in the front yard.



Last updated: 3/3/06