Craftsman Remodel - Staircase


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0005.JPG
Fri, Feb 18, 2005
DSCN0006.JPG
Fri, Feb 18, 2005
DSCN0007.JPG
Fri, Feb 18, 2005
The staircase sticks out a bit more than expected so we are going to build out the wall a few inches. For the closet door, a flush, invisible door will be there. Half way to the top. The recess under the landing is for built-in shelves.
DSCN0012.JPG
Fri, Feb 18, 2005
DSCN0005.JPG
Tue, Mar 1, 2005
DSCN0008.JPG
Tue, Mar 1, 2005
A door will go here for under-stair storage. I have stairs! Looking down the stairs.
DSCN0009.JPG
Tue, Mar 1, 2005
DSCN0015.JPG
Tue, Mar 1, 2005
DSCN0026.JPG
Sun, May 22, 2005
The house on the right complained. After construction, my house will be as high as their house. Tarps still cover parts of the house and won't be removed until the roof goes on. A good view of the storage under the stairs. The black pipe is the gas line to the upstairs heating unit.
DSCN0044.JPG
Fri, May 27, 2005
DSCN0062.JPG
Fri, May 27, 2005
DSCN0063.JPG
Fri, May 27, 2005
Another view of the black gas line going up between the studs. Under-the-stairs storage and lighting. There is a one foot crawl space to route all ducts, pipes, wires, etc.
DSCN0015.JPG
Mon, Jun 20, 2005
DSCN0019.JPG
Fri, Jul 1, 2005
IMG_0218.JPG
Thu, Aug 11, 2005
Finishing touches on the stairs. The wood triangle shape makes the stairs flow into the ceiling. With the drywall, the shelves under the stairs become apparent. A lot of storage under the stairs.
IMG_0221.JPG
Thu, Aug 11, 2005
IMG_0224.JPG
Thu, Aug 11, 2005
IMG_0225.JPG
Thu, Aug 11, 2005
We're starting to mockup the stairs. MDF is everywhere. I'm standing between the living room and dining room.
IMG_0226.JPG
Thu, Aug 11, 2005
IMG_0253.JPG
Thu, Aug 25, 2005
IMG_1393.JPG
Sat, Oct 29, 2005
The fireplace will be floated soon. The ceiling pattern was painted over. Next step is to put in the beams. Gluing up wood beams for the staircase.
IMG_1557.JPG
Tue, Nov 15, 2005
IMG_1558.JPG
Tue, Nov 15, 2005
IMG_1559.JPG
Tue, Nov 15, 2005
Shelves will fit in this recess under the stairs. It will be fully wrapped in Honduras mahogany. All large beams have a 1/4" radius at all edges. Smaller pieces have a 1/8" radius. It took about a half a day to get this beam to fit perfect.
IMG_1560.JPG
Tue, Nov 15, 2005
IMG_1645.JPG
Sat, Dec 10, 2005
IMG_1792.JPG
Wed, Dec 21, 2005
All the drywall was removed since it is uneven. Honduras mahogany will line the sides with ebony plugs. The 5" wide Brazilian Cherry floor starts to go in. The central vacuum can be seen to the right. The plate rail starts to go up at the top of the stairs.
IMG_2218.JPG
Wed, Jan 11, 2006
IMG_2219.JPG
Wed, Jan 11, 2006
IMG_2329.JPG
Wed, Feb 8, 2006
The staircase landing is all that was ready for the stain. The top of the stairs has a 6" border of cherry around it. The coat closet here is now accessed from the old side. We basically moved the door to the side wall.



Last updated: 3/3/06