Craftsman Remodel - Windows & Doors


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0009.JPG
Fri, Feb 18, 2005
DSCN0010.JPG
Fri, Feb 18, 2005
DSCN0019.JPG
Wed, Mar 2, 2005
Exterior kitchen wall. The new window is 5 feet wide instead of the old 4 feet. Chinook spends a lot of time up top now that there's a floor.
DSCN0020.JPG
Wed, Mar 2, 2005
DSCN0021.JPG
Wed, Mar 2, 2005
DSCN0022.JPG
Wed, Mar 2, 2005
The walk-in closet is HUGE! I spotted the crooked 4x4 on the right. The bottom needs to move over about a half inch. The master bath.
DSCN0005.JPG
Thu, Mar 3, 2005
DSCN0006.JPG
Thu, Mar 3, 2005
DSCN0007.JPG
Thu, Mar 3, 2005
The crooked beam. This opening will house 3 windows. This wall is one end of the new office.
DSCN0008.JPG
Thu, Mar 3, 2005
DSCN0038.JPG
Wed, Mar 9, 2005
DSCN0042.JPG
Wed, Mar 9, 2005
Master bedroom french doors onto the balcony. The orange line marks the old height of this part of the patio. It will actually be lowered about 6 inches to allow for vents to be put in. You can see the balcony joists are almost done.
DSCN0048.JPG
Wed, Mar 9, 2005
DSCN0074.JPG
Sat, Mar 12, 2005
DSCN0003.JPG
Tue, Mar 29, 2005
The previously crooked beam was straightened and the braces are put in place. The windows should arrive in about a week so the window and door openings are being framed out.
DSCN0007.JPG
Sat, Apr 9, 2005
DSCN0010.JPG
Sat, Apr 9, 2005
DSCN0011.JPG
Sat, Apr 9, 2005
The shed dormer will go in the open space. The back end of the rafters. Notice the T&G and detailed rafter tail. This is the master bedroom balcony.
DSCN0013.JPG
Tue, Apr 12, 2005
DSCN0018.JPG
Thu, Apr 14, 2005
DSCN0019.JPG
Thu, Apr 14, 2005
Standing on the roof looking into the master bathroom window. These are the 8' french doors from the living room out to the back patio. The doors had to be removed so the whole unit could be moved. Living room french doors with a major scrape during shipping. One Stop Windows & Doors said they will refinish it as soon as we are ready.
DSCN0021.JPG
Fri, Apr 15, 2005
DSCN0024.JPG
Fri, Apr 15, 2005
DSCN0025.JPG
Fri, Apr 15, 2005
The shed dormer is framed out in the master bedroom. The window flashing is being put into place. The large beam going through the front door is the header beam for the front of the garage over the garage door. The side of the shed dormer.
DSCN0027.JPG
Fri, Apr 15, 2005
DSCN0048.JPG
Sat, Apr 16, 2005
DSCN0051.JPG
Sat, Apr 16, 2005
This window above the stairs will have to be resized. It was not done according to the window schedule but according to the elevation drawings. Rich is increasing the height from 40" to 48". The plan elevation showed all of the windows the same height but the correct number to use would have been the window schedule. Office balcony door
DSCN0052.JPG
Sat, Apr 16, 2005
DSCN0053.JPG
Sat, Apr 16, 2005
DSCN0054.JPG
Sat, Apr 16, 2005
Master bath window Office window. After the metal flashing is put on, a layer of bituthane is installed. It is like a rubber tape. Rich performs a last minute check prior to installing the first window. This is a triple window over the stairs.