Craftsman Remodel - Office / Game Room


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0022.JPG
Wed, Mar 2, 2005
DSCN0007.JPG
Thu, Mar 3, 2005
DSCN0029.JPG
Tue, Mar 8, 2005
The master bath. This wall is one end of the new office. The ridge beam will fit into the slot.
DSCN0052.JPG
Wed, Mar 9, 2005
DSCN0068.JPG
Sat, Mar 12, 2005
DSCN0009.JPG
Tue, Apr 12, 2005
A lot of pieces are coming together at this corner. The Hardy Frames below are needed to structurally support all of this weight. The rafter tails are going in place. The kitchen sink plumbing vent is protruding through the office on the second floor into the ceiling.
DSCN0051.JPG
Sat, Apr 16, 2005
DSCN0053.JPG
Sat, Apr 16, 2005
DSCN0091.JPG
Sat, Apr 16, 2005
Office balcony door Office window. After the metal flashing is put on, a layer of bituthane is installed. It is like a rubber tape. Office window from the inside. Ray also came this weekend just to help with the windows. He is cleaning the caulk around the edges after the windwo was screwed into place.
DSCN0027.JPG
Thu, Apr 28, 2005
DSCN0028.JPG
Thu, Apr 28, 2005
DSCN0029.JPG
Thu, Apr 28, 2005
The west end of the office. South wall of the office. The outlet on the left is where I want to put a pinball machine. The plumbing vent is from the kitchen below. Hot & cold lines and a drain are between the studs to the right just under the floor. This is in case anyone wants to turn this into 2 rooms with a Jack & Jill bathroom.
DSCN0030.JPG
Thu, Apr 28, 2005
DSCN0031.JPG
Thu, Apr 28, 2005
DSCN0032.JPG
Thu, Apr 28, 2005
The cans on either side of the ridge are separately controlled. East side of the office. Not all windows are installed yet. Northwest side of the office.
DSCN0033.JPG
Thu, Apr 28, 2005
DSCN0034.JPG
Thu, Apr 28, 2005
DSCN0045.JPG
Sat, Apr 30, 2005
Top of the stairs looking towards the office. Heating duct in the office.
DSCN0067.JPG
Fri, May 27, 2005
DSCN0068.JPG
Fri, May 27, 2005
DSCN0069.JPG
Fri, May 27, 2005
There are 3-CAT 6 ethernet, 2-CAT 5 phone, and 2 coax lines in that one jack. Office wiring and powder room vent. Office wiring and plumbing vent for kitchen sink & dishwasher.
DSCN0070.JPG
Fri, May 27, 2005
DSCN0071.JPG
Fri, May 27, 2005
DSCN0002.JPG
Sat, Jun 4, 2005
Electrical in the office. Northwest wall. Office insulation
DSCN0003.JPG
Sat, Jun 4, 2005
DSCN0009.JPG
Mon, Jun 20, 2005
DSCN0010.JPG
Mon, Jun 20, 2005
Office insulation. See how the powder room vent turns at the top of the wall and continues along the ceiling? The office drywalling starts. Office looking towards the street.
DSCN0017.JPG
Mon, Jun 20, 2005
DSCN0018.JPG
Mon, Jun 20, 2005
IMG_0230.JPG
Thu, Aug 11, 2005
The office is ready for drywall taping. The hole for the light must have initially been cut in the wrong place. The office is ready to be primed.



Last updated: 3/3/06