Craftsman Remodel - Foundation page 4


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0054.JPG
Wed, Mar 9, 2005
DSCN0059.JPG
Wed, Mar 9, 2005
DSCN0060.JPG
Wed, Mar 9, 2005
The outline of the spa in the backyard. You can also see the cantilevered balcony. To protect the wood on the front patio, a lot of flashing was used. More flashing by the front door entryway.
DSCN0069.JPG
Sat, Mar 12, 2005
DSCN0070.JPG
Sat, Mar 12, 2005
DSCN0071.JPG
Sat, Mar 12, 2005
Rich is digging the spa hole. This will go down to bedrock and be the foundation anchor point. Outlining the patio. Digging a bit more.
DSCN0011.JPG
Tue, Mar 29, 2005
DSCN0012.JPG
Tue, Mar 29, 2005
DSCN0014.JPG
Tue, Mar 29, 2005
The front door was moved out 5 feet so the extended area will be filled with concrete. Rebar is laid out inside the spa pit. The white rock is bedrock. It will anchor the entire patio. Living room fireplace foundation is prepped for concrete.
DSCN0016.JPG
Tue, Mar 29, 2005
DSCN0017.JPG
Tue, Mar 29, 2005
DSCN0003.JPG
Thu, Mar 31, 2005
Rebar was placed in a horizontal grid as well as vertically. The spa will go here so the hole was dug to go into the bedrock. The patio retaining wall will be poured later and tie into this section through the rebar. The soils engineer inspected the patio trench today and had this to say: "tree should be removed otherwise it will damage the proposed patio and garden wall.* * owner should take responsibility for that" Cement blocks for the patio retaining wall and fireplace.
DSCN0004.JPG
Thu, Mar 31, 2005
DSCN0005.JPG
Thu, Mar 31, 2005
DSCN0031.JPG
Tue, Apr 5, 2005
Forms are put in to outline the backyard patio. Ready to fill. The slab has been poured. It still needs to go up another 3 feet or so.
DSCN0039.JPG
Tue, Apr 5, 2005
DSCN0002.JPG
Fri, Apr 8, 2005
DSCN0009.JPG
Sat, Apr 9, 2005
The patio retaining wall now surrounds the palm tree. There is about 1 to 2 feet between the bottom of the concrete and the bedrock so the roots will be able to get out. The retaining wall was poured in the wrong place. It is supposed to follow the dirt outline just above the red plastic. The blocked area will be filled in with sand and concrete. The spa will sit on that.
DSCN0003.JPG
Tue, Apr 19, 2005
DSCN0023.JPG
Tue, Apr 26, 2005
DSCN0024.JPG
Tue, Apr 26, 2005
The block wall outlining the back patio was installed. It looks really tall. The spa will go in here. The block walls seem awfully tall. Another view of the patio.
DSCN0020.JPG
Sun, May 22, 2005
DSCN0052.JPG
Fri, May 27, 2005
IMG_0388.JPG
Sat, Sep 17, 2005
Digging a new vent. Crawl space to go under this room. The foundation was sealed off when it was reinforced. The pipe to the right is for the spa tub in the downstairs bathroom.
IMG_0389.JPG
Sat, Sep 17, 2005
IMG_0390.JPG
Sat, Sep 17, 2005
IMG_0391.JPG
Sat, Sep 17, 2005
The hot tub enclosure. Steps will wrap around the curved part. See the slope. Some dirt will be brought in to flatten it out some.
IMG_0392.JPG
Sat, Sep 17, 2005
IMG_0393.JPG
Sat, Sep 17, 2005
IMG_0394.JPG
Sat, Sep 17, 2005
The hot tub slides in and will be about 1 foot higher than the block wall. On either side, stairs will go down to the lawn. A lot of stone work has been done so far. You can see the remnants on the ground. We're still trying to figure out what to do with the transition from the stairs to the wall on the right.



Last updated: 3/2/06