Craftsman Remodel - Garage


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0023.JPG
Tue, Dec 14, 2004
DSCN0024.JPG
Tue, Dec 14, 2004
DSCN0030.JPG
Thu, Dec 23, 2004
Kitchen cabinets are out of the way in the garage. They will be reused in the garage for storage.
DSCN0018.JPG
Wed, Mar 2, 2005
DSCN0016.JPG
Sat, Apr 9, 2005
DSCN0015.JPG
Wed, Apr 13, 2005
The second floor framing begins. That's the master bath. The garage roofline is going to be raised about a foot. The exposed ceiling covers the 2 existing bedrooms. They will both have vaulted ceilings now. I came home and the garage was gone.
DSCN0017.JPG
Thu, Apr 14, 2005
DSCN0020.JPG
Thu, Apr 14, 2005
DSCN0024.JPG
Fri, Apr 15, 2005
The new garage beam is in place. It's about 1 to 2 feet above the old ridge height in order to get the roof to end at the correct wall height at the end of the rafters. See how the grading goes up in the corner and down on both sides. We may have to lower the grade so you don't hit your head on the rafter tail at the corner. The window flashing is being put into place. The large beam going through the front door is the header beam for the front of the garage over the garage door.
DSCN0001.JPG
Tue, Apr 19, 2005
DSCN0002.JPG
Tue, Apr 19, 2005
DSCN0008.JPG
Tue, Apr 19, 2005
Starting to rebuild the garage walls. There was wood rot and termite damage. The garage roof takes shape. The roof was simplified so that the front patio overhang flowed into the garage roof at the same elevation. This required the garage ridge to be raised about 18". Looking down the roof ridgeline from the top of the stairs.
DSCN0009.JPG
Tue, Apr 19, 2005
DSCN0010.JPG
Tue, Apr 19, 2005
DSCN0011.JPG
Sat, Apr 23, 2005
This is where we changed the roof so it looks like one continous surface. A lone peacock on top of the house. The sheeting has started on the roof.
DSCN0013.JPG
Sat, Apr 23, 2005
DSCN0014.JPG
Sat, Apr 23, 2005
DSCN0015.JPG
Sat, Apr 23, 2005
Barge rafters installed. The bay window needs to be removed. The garage framing is complete. See how the foundation steps down. That explains the wood rot since the dirt was above that level.
DSCN0016.JPG
Sat, Apr 23, 2005
DSCN0017.JPG
Sat, Apr 23, 2005
DSCN0019.JPG
Tue, Apr 26, 2005
All of the cabinets will have to be removed due to exposure to the cheap particle board they were made of. View looking straight down the garage ridge. I was looking at the proportions compared to the window and roof above.
DSCN0048.JPG
Sun, May 15, 2005
DSCN0012.JPG
Sun, May 22, 2005
DSCN0013.JPG
Sun, May 22, 2005
An updated front view with the completed garage. All of the phone, coax, and ethernet cables are routed to the garage. They will plug into patch panels here. The plumbing is for the tankless water heater. The garage electrical sub-panel is one of three.
DSCN0007.JPG
Mon, May 30, 2005
DSCN0001.JPG
Sat, Jun 4, 2005
DSCN0002.JPG
Mon, Jun 20, 2005
I like the look of the rafter tails in the corner. The grade was lowered about 2 feet so you can now walk around the corner of the garage without hitting your head. The house bib is on the right. The garage was first to be drywalled. See the cement block from the 1957 house. My contractor said they went really cheap there and should have built it all to the same height. This would have prevented the dryrot when they backfilled the wall with dirt.
DSCN0003.JPG
Mon, Jun 20, 2005
DSCN0004.JPG
Mon, Jun 20, 2005
DSCN0005.JPG
Mon, Jun 20, 2005
The bundle of wires is for TV, phone, and internet to the house. In the corner are central vacuum and tankless water heater hookups. The wires will be installed into patch panels about 5-6 feet above the ground. The pipe in the top of the wall is the central vac line into the house.