|
Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

Mon, Jun 20, 2005
|

Thu, Jul 7, 2005
|

Thu, Jul 14, 2005
|
Finishing up the garage drywall with taping over the holes and seams for a smooth finish. |
The dirt around the garage has been completely dug out. What a difference. The hose bib is covered in red tape. |
The siding is started on the second story. |

Thu, Jul 14, 2005
|

Thu, Jul 14, 2005
|

Thu, Jul 14, 2005
|
Siding in front of the garage. |
The corner of the garage. See how everything is strapped together for added stiffness. |
Some touch up work with the roof required some drywall to be removed. |

Thu, Jul 14, 2005
|

Thu, Jul 14, 2005
|

Wed, Jul 27, 2005
|
The Rustic Southern Ledgestone has arrived. |
Another section of shingles has been completed. I don't think it's too busy but rather very detailed. |
Putting the shingles on the roof. |

Thu, Aug 11, 2005
|

Thu, Aug 11, 2005
|

Thu, Aug 11, 2005
|
The exterior is complete except for the white post. |
The front door is mahogany and has 4 clear coats on it. |
The garage door is made of two types of mahogany, each with 4 clear coats. |

Thu, Aug 25, 2005
|

Fri, Sep 9, 2005
|

Fri, Dec 23, 2005
|
The garage is freshly painted. You can see that the garage door is installed and just needs to be plugged in. |
Four pallets in total. |
Forming up the retaining wall. |

Fri, Feb 17, 2006
|

Fri, Feb 17, 2006
|
The tankless water heater is located in the back of my garage. It can supply up to a 20,000 sq ft house per the specs. This size was need to insure hot water with all showers and dishwasher running simultaneously. |
Pat trims out the window in the garage as the landscapers work in the front yard. |