Craftsman Remodel - Master Bedroom


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0013.JPG
Tue, Mar 1, 2005
DSCN0014.JPG
Tue, Mar 1, 2005
DSCN0003.JPG
Thu, Mar 3, 2005
The chimney will protrude through here. Below you can see the living room fireplace and up top, the master bedroom fireplace. A little close to the tree...don't you think? Master bedroom looking at the fireplace/chimney.
DSCN0008.JPG
Thu, Mar 3, 2005
DSCN0028.JPG
Tue, Mar 8, 2005
DSCN0029.JPG
Tue, Mar 8, 2005
Master bedroom french doors onto the balcony. Opening into the walk-in closet. The ridge beam will fit into the slot.
DSCN0041.JPG
Wed, Mar 9, 2005
DSCN0042.JPG
Wed, Mar 9, 2005
DSCN0043.JPG
Wed, Mar 9, 2005
Top of the stairs looking towards the master bedroom. You can see the balcony joists are almost done. This beam is actually a very large plywood beam.
DSCN0044.JPG
Wed, Mar 9, 2005
DSCN0049.JPG
Wed, Mar 9, 2005
DSCN0003.JPG
Sat, Apr 9, 2005
The first roof beam is put in place.
DSCN0007.JPG
Sat, Apr 9, 2005
DSCN0008.JPG
Sat, Apr 9, 2005
DSCN0010.JPG
Sat, Apr 9, 2005
The shed dormer will go in the open space. This rebar is to reinforce the chimney. The back end of the rafters.
DSCN0014.JPG
Sat, Apr 9, 2005
DSCN0011.JPG
Tue, Apr 12, 2005
DSCN0021.JPG
Fri, Apr 15, 2005
View from the balcony looking inside the master bedroom. The foundation is set to start the master bedroom fireplace. The shed dormer is framed out in the master bedroom.
DSCN0025.JPG
Fri, Apr 15, 2005
DSCN0026.JPG
Fri, Apr 15, 2005
DSCN0063.JPG
Sat, Apr 16, 2005
The side of the shed dormer. An arch was put into the passageway from the master bedroom to the bath and closet. It will have to come out. There are no arches in the structure. Looking south at the master bedroom shed dormer.
DSCN0064.JPG
Sat, Apr 16, 2005
DSCN0076.JPG
Sat, Apr 16, 2005
DSCN0078.JPG
Sat, Apr 16, 2005
Standing on the second story roof, I can look down the chimney at the master bedroom fireplace. Front of the shed dormer looking north. The painters came in and stained the T&G today.
DSCN0079.JPG
Sat, Apr 16, 2005
DSCN0080.JPG
Sat, Apr 16, 2005
DSCN0081.JPG
Sat, Apr 16, 2005
DSCN0082.JPG
Sat, Apr 16, 2005
DSCN0035.JPG
Thu, Apr 28, 2005
DSCN0036.JPG
Thu, Apr 28, 2005
The chimney is almost complete. The hole was originally cut for the heating duct but it turns out the duct is being run outside the bedroom on the left side of the wall on the left.



Last updated: 3/3/06