Craftsman Remodel - Master Bedroom page 2


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0037.JPG
Thu, Apr 28, 2005
DSCN0047.JPG
Sat, Apr 30, 2005
DSCN0073.JPG
Fri, May 27, 2005
We're still waiting for the shed dormer windows. Installing the upstairs heating unit. The upstairs heating unit is in a crawl space above the arch.
DSCN0074.JPG
Fri, May 27, 2005
DSCN0006.JPG
Sat, Jun 4, 2005
DSCN0019.JPG
Mon, Jun 20, 2005
The white pipe is the central vacuum line. Insulation above dormer in master bedroom. We're still waiting for the dormer windows. The rear, left speaker wire in the master bedroom.
DSCN0008.JPG
Fri, Jul 1, 2005
DSCN0009.JPG
Fri, Jul 1, 2005
DSCN0014.JPG
Wed, Jul 27, 2005
The master bedroom ceiling is covered except for the T&G in the dormer. Notice the beam was covered. It will be finished with a wood veneer. The front speaker wires in the master bedroom are protruding from the drywall. The shed dormer windows finally came in and were installed. The speaker wire coming out of the wall was moved about a fit to match the wire coming out of the other wall.
IMG_0675.JPG
Thu, Oct 13, 2005
IMG_0676.JPG
Thu, Oct 13, 2005
IMG_0677.JPG
Thu, Oct 13, 2005
Color samples in the master bedroom. Green slate on the balconies.
IMG_1408.JPG
Sat, Oct 29, 2005
IMG_1422.JPG
Sat, Oct 29, 2005
IMG_1423.JPG
Sat, Oct 29, 2005
The stain was applied so the roof looks like it continues into the house through the wall. The upstairs fireplace is being prepped for floating. Upstairs HVAC.
IMG_1520.JPG
Fri, Nov 11, 2005
IMG_1521.JPG
Fri, Nov 11, 2005
IMG_1525.JPG
Fri, Nov 11, 2005
Dave Barlow works on the mahogany beam in the master bedroom. A close up of the master bedroom beam. Dry-fitting the master bedroom beam. See the scarf joint.
IMG_1562.JPG
Tue, Nov 15, 2005
IMG_1563.JPG
Tue, Nov 15, 2005
IMG_1564.JPG
Tue, Nov 15, 2005
Clamping up the scarf joint in the master bedroom beam. The hearth has been floated in preparation for ceramic tile. Another view of the master bedroom fireplace.
IMG_1566.JPG
Tue, Nov 15, 2005
IMG_1573.JPG
Tue, Nov 15, 2005
IMG_1624.JPG
Thu, Dec 1, 2005
We just need to add trim around the windows and doors. The top, right color is called Abingdon Putty. That will be in the entire master suite. The master bedroom fireplace has also been stuccoed. Dave has finished the trim around the windows. It looks too big.
IMG_1625.JPG
Thu, Dec 1, 2005
IMG_1626.JPG
Thu, Dec 1, 2005
IMG_1627.JPG
Thu, Dec 1, 2005
The trim needs to be removed and replaced with small trim to keep the individual look of each window.
IMG_1702.JPG
Tue, Dec 13, 2005
IMG_1793.JPG
Wed, Dec 21, 2005
IMG_1852.JPG
Fri, Dec 23, 2005
Master bedroom floor with a trim piece around the fireplace. Floor and plate rail in the master bedroom. The master bedroom floor is stained black to fill in the beveled edges and voids in the wood. It will be sanded when dry.



Last updated: 3/3/06