Craftsman Remodel - Plumbing page 2


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0038.JPG
Fri, May 27, 2005
DSCN0041.JPG
Fri, May 27, 2005
DSCN0043.JPG
Fri, May 27, 2005
The range will go here. Left side of fireplace in living room with gas lines installed to the patio fireplace. Right side of fireplace in living room. The wall is being firred out so the fireplace looks symmetric with respect to the other wall.
DSCN0044.JPG
Fri, May 27, 2005
DSCN0049.JPG
Fri, May 27, 2005
DSCN0052.JPG
Fri, May 27, 2005
Another view of the black gas line going up between the studs. The downstairs heating unit will go here. Crawl space to go under this room. The foundation was sealed off when it was reinforced. The pipe to the right is for the spa tub in the downstairs bathroom.
DSCN0053.JPG
Fri, May 27, 2005
DSCN0056.JPG
Fri, May 27, 2005
DSCN0057.JPG
Fri, May 27, 2005
It's very crowded in the ceiling here. Looking down the hallway towards the kid's bedroom. Plumbing to the master bathroom.
DSCN0061.JPG
Fri, May 27, 2005
DSCN0063.JPG
Fri, May 27, 2005
DSCN0068.JPG
Fri, May 27, 2005
This plumbing feeds the master bath tub above. There is a one foot crawl space to route all ducts, pipes, wires, etc. Office wiring and powder room vent.
DSCN0069.JPG
Fri, May 27, 2005
DSCN0076.JPG
Fri, May 27, 2005
DSCN0078.JPG
Fri, May 27, 2005
Office wiring and plumbing vent for kitchen sink & dishwasher. In the closet looking towards the master bath. The white pipe on the left is the central vacuum. A cabinet will go up here to support Mr. Steam.
DSCN0079.JPG
Fri, May 27, 2005
DSCN0080.JPG
Fri, May 27, 2005
DSCN0081.JPG
Fri, May 27, 2005
All of the plumbing and electrical needs to shift left. Vent pipe. This is the pipe where the water will first overflow if the system backs up. The outlet will power the spa tub. The master bath shower layout was tweaked several times.
DSCN0001.JPG
Sat, Jun 4, 2005
DSCN0003.JPG
Sat, Jun 4, 2005
DSCN0010.JPG
Sat, Jun 4, 2005
The grade was lowered about 2 feet so you can now walk around the corner of the garage without hitting your head. The house bib is on the right. Office insulation. See how the powder room vent turns at the top of the wall and continues along the ceiling? A joist in the kitchen was moved over to make room for a 10" duct for the range vent. The white central vacuum pipe was cut. Notice the two lights that will hang down over the counter on the right.
DSCN0011.JPG
Sat, Jun 4, 2005
DSCN0012.JPG
Fri, Jun 17, 2005
DSCN0013.JPG
Fri, Jun 17, 2005
This is the only access under the house for the gym/bedroom. The area was isolated during the foundation reinforcement. A trap door will be left here. The dark spot is where the jacuzzi pump used to be. It's currently missing. A nice view of the shower enclosure following the hot mop. See how the bench and the tub deck to the left are the same piece of wood. You can see all of the plumbing in the master shower here. There is a steam shower spray unit, steam control unit, 3 body sprays, a deluge (not rain) shower head, hand shower, thermostatic valve, and three volume control valves.
DSCN0014.JPG
Fri, Jun 17, 2005
DSCN0003.JPG
Mon, Jun 20, 2005
DSCN0004.JPG
Fri, Jul 1, 2005
The tub frame and shower are ready to be lathed prior to tiling. The bundle of wires is for TV, phone, and internet to the house. In the corner are central vacuum and tankless water heater hookups. The green drywall is fire resistant.
DSCN0005.JPG
Fri, Jul 1, 2005
DSCN0015.JPG
Fri, Jul 1, 2005
DSCN0018.JPG
Thu, Jul 7, 2005
The ceiling appears a lot less pockmarked with lights with the drywall. See the 10" ducting for the range on the right. It crosses the ceiling to the left and exits the side of the house. The stained water table is around the house and ready for shingles above and stone below. Southern Rustic Ledgestone will start to go on this Wednesday, July 13th. Copper flashing has been placed on the balcony. The gas key to the fireplace is on the lower right wall.