Craftsman Remodel - Plumbing page 3


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0019.JPG
Thu, Jul 7, 2005
DSCN0021.JPG
Thu, Jul 7, 2005
DSCN0006.JPG
Wed, Jul 27, 2005
There is an electrical outlet and natural gas line in the lower part of the wall. I'm going to put my BBQ here. The dirt around the garage has been completely dug out. What a difference. The hose bib is covered in red tape. See the copper rain gutters?
DSCN0013.JPG
Wed, Jul 27, 2005
IMG_0228.JPG
Thu, Aug 11, 2005
IMG_0233.JPG
Thu, Aug 11, 2005
This drain access is to code but looks like crap! It's in the downstairs hallway. All I can say is they better be extremely creative or I'm going to have a cow! The laundry room was floated today. Once the floor dries, the black paper will be floated.
IMG_0234.JPG
Thu, Aug 11, 2005
IMG_0252.JPG
Thu, Aug 25, 2005
IMG_0262.JPG
Sun, Aug 28, 2005
Looking at the side of the shower. You can see the alcove in the wall that was just put in the other day. The garage is freshly painted. You can see that the garage door is installed and just needs to be plugged in. The steam shower has been inspected and is ready to be floated.
IMG_0263.JPG
Sun, Aug 28, 2005
IMG_0276.JPG
Fri, Sep 2, 2005
IMG_0277.JPG
Fri, Sep 2, 2005
On the exterior wall behind the tub is a copper access door. The recess in the wall is 2 feet tall and fills the space betwen the studs.
IMG_0647.JPG
Tue, Oct 4, 2005
IMG_0648.JPG
Tue, Oct 4, 2005
IMG_0649.JPG
Tue, Oct 4, 2005
The first cabinets arrived in the master bathroom. The cabinets are made of American Cherry. Look closely at the center of the toe kick. There is a rectangle cut in there for the electric heater. All that is left is the ceiling and floor. The ceiling has to be done because it is a steam shower and will be completely sealed.
IMG_0661.JPG
Thu, Oct 13, 2005
IMG_0662.JPG
Thu, Oct 13, 2005
IMG_1415.JPG
Sat, Oct 29, 2005
We have to dig 6 feet down only 2 feet away from the utility pole. The Shower
IMG_1416.JPG
Sat, Oct 29, 2005
IMG_1418.JPG
Sat, Oct 29, 2005
IMG_1419.JPG
Sat, Oct 29, 2005
Glass will enclose the shower. It will go right over the bench. Drain for the tub.
IMG_1522.JPG
Fri, Nov 11, 2005
IMG_1523.JPG
Fri, Nov 11, 2005
IMG_1543.JPG
Tue, Nov 15, 2005
The sewer pipe was installed. The pipe sticking out of the ground was for testing the line for the inspector. The sewer line ties in to the main line 8 feet from the fence line in the back corner of the property. Outside the kitchen, the house has been connected to the sewer line.
IMG_1556.JPG
Tue, Nov 15, 2005
IMG_1567.JPG
Tue, Nov 15, 2005
IMG_1571.JPG
Tue, Nov 15, 2005
The tub is waiting to go in. First we need to bring it upstairs. The steam shower is coming along nice. The kitchen sink is in. The water for the sink and dishwasher is in here along with the outlet for the dishwasher and disposal. To the right is a bottled water line to feed the fridge and sink water dispenser.
IMG_1643.JPG
Sat, Dec 10, 2005
IMG_1708.JPG
Thu, Dec 15, 2005
IMG_1840.JPG
Fri, Dec 23, 2005
The range will slide in here. See how the Cherry trim goes into the Mahogany beam? There is a 3/8" overlap of the sink. The holes for the faucet, soap, drinking water, and vent are drilled. Installing the tub in the master bathroom.



Last updated: 3/2/06