Note: Since completion of the house I have also decided to allow guest bloggers to post articles related to remodeling. This continues the education process.
TIMELINE
Architect Selection - December 2002 through January 2003
Getting a Permit - January 2003 through November 2004
Construction - November 2004 through September 2006
Post Construction - October 2006 through ???
Drawings Sent to Structural Engineer
Mon, Apr 19 2004 03:58 PM
| engineer, Getting a Permit, Remodel
| Permalink
The design Development drawings were sent to the structural engineer at Palos Verdes Engineering.