In this blog I will do my best to describe the process I went through in turning my 1957 Ranch-style house into a 2006 Craftsman house as inspired by the Gamble House in Pasadena. Please feel free to comment on anything I write and ask questions as it is the only way we learn.

Note: Since completion of the house I have also decided to allow guest bloggers to post articles related to remodeling. This continues the education process.


TIMELINE
Architect Selection - December 2002 through January 2003
Getting a Permit - January 2003 through November 2004
Construction - November 2004 through September 2006
Post Construction - October 2006 through ???



Painting Lesson Learned, Stairs Almost Done, Landscaping Going Well

No....not yet! I hate saying this as I haven't been right yet but I expect us to start moving in by mid-July.
• We are still painting rooms. Probably for another 3 weeks. The problem is that all wall and ceiling surfaces need to be skim-coated. My GC was trying to keep the costs down by spot patching the walls and in hindsight it looks like it ended up costing me quite a bit more because it takes forever to spot fix these walls with all of the wood trim everywhere.

A MAJOR Lesson Learned here is plaster the whole house or go in with the plan to skim coat over ALL drywall surfaces. The bottom line is drywall may be faster and cheaper if your building a bunch of condos but it ends up costing a lot more if you are trying to do a good quality job. About half of the screws popped out with all of the hammering due to woodwork finishing.
• Dave Barlow has finished the stairs and wainscoting and is now working on the staircase railing. After that, he should be done. He's been with us 1 year now, did all of the interior woodwork, and was only hired to do the stairs. Unbelievable!

The risers and treads fit together like a puzzle in this Craftsman staircase Ebony plugs in the Craftsman staircase siding


• Landscaping is going pretty well. The front driveway is complete, the front pathway is just about done, sprinkler valves are in, final grading and irrigation starts next week, and the waterfall/pond will finally start next week.

Add/Review Comments


Everybody is Working - Painting, Murals, Library, Stairs, Wainscot, Playhouse, Landscaping

Well it's mid May and I'm not moving in yet. It's quite frustrating and basically comes down to manpower. My new projection is the third week of June. I'm still taking pictures and will eventually get them loaded but I just can't seem to get in the mood to do it. Maybe I'm just lazy. Trust me though....the house is coming out so much better than I had hoped for and I will eventually get the pictures loaded. Once complete I will look into creating a searchable photo database to make it easy to find pictures you are interested in. Well here's this month's progress.
• We have a painter going room to room now. We had a muralist paint this big oak tree with animals in the kids' room.

Mural of an oak tree with animals in the girls' bedroom.

• We are almost finished laying all of the exterior flagstone around the house. The driveway will be poured this Saturday.
• The master closet is complete. Cedar-lined walls and American cherry cabinets.

Master closet lined in cedar with cherry cabinets

• The library is built. In fact, all cabinetry is complete and will be finished over the next few days.

Unfinished library cabinets with built-in Murphy bed. Library cabinets with Murphy bed

• The stair treads have been sent out for finishing. Dave is starting on the wainscot in the bathrooms and the newell posts for the stairs.

Mahogany, bathroom wainscot being installed

• A playhouse was built in the backyard. We used the leftover shingles for siding, shingles for the roof, Brazilian Cherry and limestone for the floors. Scaled down rafters were carved. It looks awesome!

Craftsman playhouse made from leftover materials

• The waterfall and pond construction will start any day now.
• I had almost half of the exterior stone siding removed and replaced by a new stone guy. My first guy is great at ceramic tile but not so when it came to stone.
• I almost forgot....For the past four months, Matt Keyes of Keyes Landscape Design has been implementing the landscape design. It is amazing! So far we have 18 tons of boulders and need another 6 tons. I believe the landscaping will actually finish before the house now. There is a consistent group of guys that work 6 days a week, 8-10 hours a day. They are really good and fast!

Add/Review Comments


Retaining Wall and Fireplace Mantel Complete, Upstairs Painting, Historic Lighting

• The North retaining wall is complete.
• The master bedroom fireplace mantle is complete.

Master bedroom Craftsman, mahogany fireplace mantel


• The painters are starting upstairs tomorrow. They have a lot of sanding to do.
• Su Bacon of Historic Lighting is coming out tomorrow to see the house and advise on entry and stairway chandeliers I'm purchasing from her. They are designed by the craftsman Karl Berry from New York. Su has been a consultant on many big projects. When we went into her Arcadia store, we found out that she was consulted for lighting on the TV show Extreme Makeover: Home Edition. I told her about the living room fireplace we were creating based on a picture I saw in a magazine. She knew it well as she was the designer. How cool is that!
• My updated guess on a move-in date is mid May.

Add/Review Comments


Stairwell Wainscot, Concrete Poured, Work Stopped, Gone Surfing

I received a letter from the City stating that the permit will expire on May 12. At least we now have a target date. I would still like to shoot for final inspection by May 1st.
• We are laying out the stairwell wainscoting. It will be Honduran Mahogany with 6 distinct layers to give it a depth effect. Just wait and see...
• Drainage was put in on the North side of the house.
• Concrete was poured on the North side so we can now build the block wall for the planter.
• Two carpenters and the electrician are surfing and camping at Big Sur for the last two days. My GC is sick with food poisoning and Dave, the finish carpenter is on another job for 2 days. In other words, NO WORK FOR THE LAST 2 DAYS IN THE HOUSE. How in the world will we finish in time when things like this happen?
Add/Review Comments


Gamble House Lights, Floor Issue, Fireplaces, Ebony Plugs, Kitchen Tile

I have finally caught up with the pictures! I have been taking more than I could annotate and finally caught up today. I am adding about another 500 pictures from the last few months. So let me give you all the rundown.
• I created the stained glass for the light in the December 18th blog post only to find out that half of them were too small. After another week of stained glass work, I finished and my fingertips were raw. I brought the glass panels to Old California Lantern Company for installation and received the lights about 2 weeks ago. They are absolutely stunning!

Gamble House replica light with my own stained glass


• The floors are installed. Lesson learned - make sure the installers verify that the door still opens before the whole thing is laid!!!
• The kitchen, laundry room, and master bathroom American cherry cabinets have been stained with Jel'd Stain Red Mahogany by Wood Kote.

The kitchen cabinets were stained with Jel'd Stain Red Mahogany.

• The walk-in closet cabinets are almost complete.
The walk-in closet cabinets are almost complete


• The master bedroom fireplace is covered with a beautiful Batchelder tile from Mission Tile West in Santa Monica.

Master bedroom fireplace covered in Batchelder tile.

• The living room entertainment center is built and ready for finishing.
The unfinished entertatinment center is ready for stain.


• Dave Barlow is installing the ebony plugs in the scarf joints around the house.



• The living room fireplace is having Moonlight flagstone installed right now. It's a very slow process as each piece is being chiseled to the right dimensions. Look on the left part of the mantel and you can see my sugar cube mockup of the stone corner. I made this to make sure they understood how I wanted the 45-degree angles handled.

The Moonlight flagstone is being installed on the living room fireplace.

• The appliances will be installed tomorrow.
• Clear-coating of the mahogany will start in about 2 weeks followed by painting the walls and ceiling.
• Glass tile from Mission Tile West has been installed in the kitchen. It looks amazing!

Glass tile installed in the Craftsman kitchen.

Well, I'm going to start uploading the pictures now and then I'm off to Kauai for my 40th birthday.

Add/Review Comments (1) Show Comments


Wall Sconce Stained Glass, Wood Floors Being Installed

Yes, I'm delinquent with the update again.There are a lot more pictures that I haven't had a chance to put on the site yet so keep checking back. A lot is going on around here.
• I'm really busy now creating the stained glass for some authentic Gamble House reproductions. The stained glass will be different and my own design. I'll tie that into the front door window whenever I get around to it. Go to Old California Lantern Company to see the best Arts & Crafts lanterns. I went in there and 3 1/2 hours later I outfitted my entire house.



• The hardwood floors are being installed right now. It is long-length (8'-16'), quarter-sawn, 5"-wide, Brazilian Cherry. We are having a slight bevel put between the planks to give it an older look. The floor will be stained black, sanded, and then stained with a green dye to subdue the bright reds associated with Brazilian cherry.

Brazilian cherry floor installed in office

Add/Review Comments


Soapstone Counter Installation

The soapstone countertops were installed in the kitchen and laundry rooms today. The templates were made on Tuesday and the countertop was installed on Thursday. Soapstone West has great service!
Below is a play-by-play of the installation.


These guys drove in from Arizona, and within 2 days measured, fabricated, and installed the soapstone countertops.

These guys drove in from Arizona, and within 2 days measured, fabricated, and installed the soapstone countertops.

These slabs are HEAVY at 20 lbs/sq ft.

These slabs are heavy!

There is a 3/8" overlap of the sink. The holes for the faucet, soap, drinking water, and vent are drilled.

Kitchen soapstone is being installed around the sink.

Black epoxy is mixed up to join the soapstone pieces and fill in any voids.

Black epoxy is mixed up to join the soapstone pieces and fill in any voids.

A ding is repaired with the special epoxy. After it dries you can't even see it.

A ding is repaired with the special epoxy

Even through the talcum powder layer you can see the caramel vein showing through.

The soapstone counter pieces are being bonded together.

Soapstone installation is messy work.

Sanding soapstone is messy work.

Soapstone is much denser than granite and can't be stained. However, it is soft enough so that hand sanding can be accomplished to smooth the edges.

Soapstone is much denser than granite and can't be stained. However, it is soft enough so that hand sanding can be accomplished to smooth the edges.

This kitchen corner's soapstone installation is complete.

This looks gray now but wait until it's oiled.

Kitchen soapstone is installed

The range will slide in between these two pieces.

I oiled the soapstone with mineral oil. It's shiny because it's still wet. When dry, it will have a matte finish.

Freshly oiled soapstone in kitchen is shiny.

The counter looks great! The door to the laundry room has a "Delta" pattern in it.

Craftsman kitchen with freshly oiled soapstone

Add/Review Comments (2) Show Comments


The Finishes are Going In

Lately, I have been overwhelmed with the number of things going on at the house and though I have been taking pictures, I have not had time to annotate and post them. They will arrive, just a little patience.
• The master bathroom has been tiled and looks great!

Master bathroom is tiled in glass, slate, and seagrass limestone.


• Cherry cabinets have been installed in the kitchen, master bath, and laundry room. Unfortunately, the kitchen sink cabinet was 3/4" off center from the window. The cabinet had to be shortened by 3/4" on both ends to keep it symmetric and centered on the window.

Kitchen sink cabinet is off center.


• I have purchased the soapstone slabs for the kitchen and laundry room from Soapstone West in Escondido, CA.
• Brazilian Cherry floors have been ordered from Dutko Hardwood Floors in Lawndale, CA and will be installed the first week of December. Talk about a backlog.
• The fireplace mantel has been installed and stained. Plaster will go above it and Moonlight flagstone will go below. It will be cut into manicured blocks of varying size.

Craftsman Mahogany Fireplace Mantel


• Actual work has started on the staircase. There was a lot of planning to get to this point.
• The hot tub has been delivered. We're just waiting for power now.

The hot tub has been slid into place


• The Golden Busckskin flagstone has been installed on the front and back patios.

Golden Bucksking Flagstone has been installed on the patio


• The green slate has been installed on the balconies.
• Paint samples are all over the walls. I hear they will start within 2 weeks with the paint.

Paint samples are on the walls


• Interior doors are installed and stained.

Interior Craftsman door with Delta glass

Add/Review Comments (4) Show Comments


Garage Door Installed, Interior Primed, Bathroom Floated, Ceiling Beams Installed

Not much has happened the last month. Vacations and other jobs have gotten in the way. However, the work that has been done is looking really good. So here's the run down.
• All interior doors have been ordered but we have to wait about a month. Expected delivery is 9/14/05.
• The garage door was installed.



• Interior of house and garage has had two coats of primer applied.
• Master bathroom has been floated and is ready for tile.
• The ceiling beams are being installed single-handedly by Dave Barlow. The planning for this was extremely difficult as there is quite a bit of wood and detail in a Craftsman style house. We are designing the layouts on the fly for the ceiling, crown moulding, plate/picture rail, floor trim, wainscoting, and staircase. All of these pieces tie together as one entire wood 'system'. Our design of this is staying about one or two steps ahead of the build. One problem is that we don't have our wood floors in yet so we can't build the jambs up from the floor.

Dave Barlow installs the living room beams

Add/Review Comments


Camera Broken, Drywall Taped and Sanded, Starting Staircase, Siding Complete

• Bad news. I took a trip and my camera got some dirt in it. It now doesn't work so no pictures. The new camera should be coming in a few days.
• Drywall is sanded and just about ready for primer.

Drywall is taped and sanded. Ready for primer.


• Dave Barlow is working the staircase and will be doing other fine carpentry in the house. He is creating mockups of everything out of MDF (fiberboard) prior to cutting the real wood.

MDF Craftsman staircase mockup


• All shingle and stone siding is installed.

Craftsman shingle and stone siding is installed.

Add/Review Comments


Next Page