Note: Since completion of the house I have also decided to allow guest bloggers to post articles related to remodeling. This continues the education process.
TIMELINE
Architect Selection - December 2002 through January 2003
Getting a Permit - January 2003 through November 2004
Construction - November 2004 through September 2006
Post Construction - October 2006 through ???
Construction is Complete But Who Is The City Forester?
• Most everything is done now and we are in the process of moving in. In this city, to get signed off, the City Forester must sign off the inspection report. He came over, pulled out his spray paint and put this circle 7 feet off the street in the middle of my front yard and said you will plant a 24" box, Japanese Cherry Tree a.k.a. Pink Cloud. Since this is in the City right of way, I am basically giving the city a gift per their direction. In my opinion, there are now too many trees in the front yard as it was perfectly balanced. Time will tell how it all fills out.
• Code states that glass doors must be put in all interior fireplaces. There is a fireplace store in town that rents doors for 30 days to get through inspection for just over $200. It's one of their standard services!!!
• All that is left to do is minor stuff; low voltage lighting, seal the fence and new gates, make the stained glass for the front door, kitchen, and entertainment center doors, etc.
• There is one more thing I forgot. We had the rear patio fireplace stone redone to get rid of the seam at the 45 degree bend in the wall. While that was accomplished, the rest of the stone was redone but not to my satisfaction. I'm going to redo the opening and face of the fireplace again.
• I am hoping to have the final pictures online by Thanksgiving. There are a lot and I still need to categorize and annotate them all.
And last but not least, there is a third child on the way that is due at the end of November. There is a struggle with my gym being turned into a baby's room. For now, we are going to share it as I will not give it up that easily and the baby will mostly be in our room for the next couple of years. Maybe by then I will have to remodel to add another room! Just kidding....you can put a fork in it because this house is done!!!
Retaining Wall and Fireplace Mantel Complete, Upstairs Painting, Historic Lighting
• The master bedroom fireplace mantle is complete.
• The painters are starting upstairs tomorrow. They have a lot of sanding to do.
• Su Bacon of Historic Lighting is coming out tomorrow to see the house and advise on entry and stairway chandeliers I'm purchasing from her. They are designed by the craftsman Karl Berry from New York. Su has been a consultant on many big projects. When we went into her Arcadia store, we found out that she was consulted for lighting on the TV show Extreme Makeover: Home Edition. I told her about the living room fireplace we were creating based on a picture I saw in a magazine. She knew it well as she was the designer. How cool is that!
• My updated guess on a move-in date is mid May.
Gamble House Lights, Floor Issue, Fireplaces, Ebony Plugs, Kitchen Tile
• I created the stained glass for the light in the December 18th blog post only to find out that half of them were too small. After another week of stained glass work, I finished and my fingertips were raw. I brought the glass panels to Old California Lantern Company for installation and received the lights about 2 weeks ago. They are absolutely stunning!
• The floors are installed. Lesson learned - make sure the installers verify that the door still opens before the whole thing is laid!!!
• The kitchen, laundry room, and master bathroom American cherry cabinets have been stained with Jel'd Stain Red Mahogany by Wood Kote.
• The walk-in closet cabinets are almost complete.
• The master bedroom fireplace is covered with a beautiful Batchelder tile from Mission Tile West in Santa Monica.
• The living room entertainment center is built and ready for finishing.
• Dave Barlow is installing the ebony plugs in the scarf joints around the house.
• The living room fireplace is having Moonlight flagstone installed right now. It's a very slow process as each piece is being chiseled to the right dimensions. Look on the left part of the mantel and you can see my sugar cube mockup of the stone corner. I made this to make sure they understood how I wanted the 45-degree angles handled.
• The appliances will be installed tomorrow.
• Clear-coating of the mahogany will start in about 2 weeks followed by painting the walls and ceiling.
• Glass tile from Mission Tile West has been installed in the kitchen. It looks amazing!
Well, I'm going to start uploading the pictures now and then I'm off to Kauai for my 40th birthday.
The Finishes are Going In
• The master bathroom has been tiled and looks great!
• Cherry cabinets have been installed in the kitchen, master bath, and laundry room. Unfortunately, the kitchen sink cabinet was 3/4" off center from the window. The cabinet had to be shortened by 3/4" on both ends to keep it symmetric and centered on the window.
• I have purchased the soapstone slabs for the kitchen and laundry room from Soapstone West in Escondido, CA.
• Brazilian Cherry floors have been ordered from Dutko Hardwood Floors in Lawndale, CA and will be installed the first week of December. Talk about a backlog.
• The fireplace mantel has been installed and stained. Plaster will go above it and Moonlight flagstone will go below. It will be cut into manicured blocks of varying size.
• Actual work has started on the staircase. There was a lot of planning to get to this point.
• The hot tub has been delivered. We're just waiting for power now.
• The Golden Busckskin flagstone has been installed on the front and back patios.
• The green slate has been installed on the balconies.
• Paint samples are all over the walls. I hear they will start within 2 weeks with the paint.
• Interior doors are installed and stained.
Fireplace Construction Starts
Start Demolition
Fireplace Demolition
Next Page