In this blog I will do my best to describe the process I went through in turning my 1957 Ranch-style house into a 2006 Craftsman house as inspired by the Gamble House in Pasadena. Please feel free to comment on anything I write and ask questions as it is the only way we learn.

Note: Since completion of the house I have also decided to allow guest bloggers to post articles related to remodeling. This continues the education process.


TIMELINE
Architect Selection - December 2002 through January 2003
Getting a Permit - January 2003 through November 2004
Construction - November 2004 through September 2006
Post Construction - October 2006 through ???



Construction is Complete But Who Is The City Forester?

September 24th was the 2 year anniversary of when we broke ground!!!
• Most everything is done now and we are in the process of moving in. In this city, to get signed off, the City Forester must sign off the inspection report. He came over, pulled out his spray paint and put this circle 7 feet off the street in the middle of my front yard and said you will plant a 24" box, Japanese Cherry Tree a.k.a. Pink Cloud. Since this is in the City right of way, I am basically giving the city a gift per their direction. In my opinion, there are now too many trees in the front yard as it was perfectly balanced. Time will tell how it all fills out.


• Code states that glass doors must be put in all interior fireplaces. There is a fireplace store in town that rents doors for 30 days to get through inspection for just over $200. It's one of their standard services!!!

Temporary glass fireplace door


• All that is left to do is minor stuff; low voltage lighting, seal the fence and new gates, make the stained glass for the front door, kitchen, and entertainment center doors, etc.
• There is one more thing I forgot. We had the rear patio fireplace stone redone to get rid of the seam at the 45 degree bend in the wall. While that was accomplished, the rest of the stone was redone but not to my satisfaction. I'm going to redo the opening and face of the fireplace again.
• I am hoping to have the final pictures online by Thanksgiving. There are a lot and I still need to categorize and annotate them all.
And last but not least, there is a third child on the way that is due at the end of November. There is a struggle with my gym being turned into a baby's room. For now, we are going to share it as I will not give it up that easily and the baby will mostly be in our room for the next couple of years. Maybe by then I will have to remodel to add another room! Just kidding....you can put a fork in it because this house is done!!!

Add/Review Comments (2)


Retaining Wall and Fireplace Mantel Complete, Upstairs Painting, Historic Lighting

• The North retaining wall is complete.
• The master bedroom fireplace mantle is complete.

Master bedroom Craftsman, mahogany fireplace mantel


• The painters are starting upstairs tomorrow. They have a lot of sanding to do.
• Su Bacon of Historic Lighting is coming out tomorrow to see the house and advise on entry and stairway chandeliers I'm purchasing from her. They are designed by the craftsman Karl Berry from New York. Su has been a consultant on many big projects. When we went into her Arcadia store, we found out that she was consulted for lighting on the TV show Extreme Makeover: Home Edition. I told her about the living room fireplace we were creating based on a picture I saw in a magazine. She knew it well as she was the designer. How cool is that!
• My updated guess on a move-in date is mid May.

Add/Review Comments


Gamble House Lights, Floor Issue, Fireplaces, Ebony Plugs, Kitchen Tile

I have finally caught up with the pictures! I have been taking more than I could annotate and finally caught up today. I am adding about another 500 pictures from the last few months. So let me give you all the rundown.
• I created the stained glass for the light in the December 18th blog post only to find out that half of them were too small. After another week of stained glass work, I finished and my fingertips were raw. I brought the glass panels to Old California Lantern Company for installation and received the lights about 2 weeks ago. They are absolutely stunning!

Gamble House replica light with my own stained glass


• The floors are installed. Lesson learned - make sure the installers verify that the door still opens before the whole thing is laid!!!
• The kitchen, laundry room, and master bathroom American cherry cabinets have been stained with Jel'd Stain Red Mahogany by Wood Kote.

The kitchen cabinets were stained with Jel'd Stain Red Mahogany.

• The walk-in closet cabinets are almost complete.
The walk-in closet cabinets are almost complete


• The master bedroom fireplace is covered with a beautiful Batchelder tile from Mission Tile West in Santa Monica.

Master bedroom fireplace covered in Batchelder tile.

• The living room entertainment center is built and ready for finishing.
The unfinished entertatinment center is ready for stain.


• Dave Barlow is installing the ebony plugs in the scarf joints around the house.



• The living room fireplace is having Moonlight flagstone installed right now. It's a very slow process as each piece is being chiseled to the right dimensions. Look on the left part of the mantel and you can see my sugar cube mockup of the stone corner. I made this to make sure they understood how I wanted the 45-degree angles handled.

The Moonlight flagstone is being installed on the living room fireplace.

• The appliances will be installed tomorrow.
• Clear-coating of the mahogany will start in about 2 weeks followed by painting the walls and ceiling.
• Glass tile from Mission Tile West has been installed in the kitchen. It looks amazing!

Glass tile installed in the Craftsman kitchen.

Well, I'm going to start uploading the pictures now and then I'm off to Kauai for my 40th birthday.

Add/Review Comments (1)


The Finishes are Going In

Lately, I have been overwhelmed with the number of things going on at the house and though I have been taking pictures, I have not had time to annotate and post them. They will arrive, just a little patience.
• The master bathroom has been tiled and looks great!

Master bathroom is tiled in glass, slate, and seagrass limestone.


• Cherry cabinets have been installed in the kitchen, master bath, and laundry room. Unfortunately, the kitchen sink cabinet was 3/4" off center from the window. The cabinet had to be shortened by 3/4" on both ends to keep it symmetric and centered on the window.

Kitchen sink cabinet is off center.


• I have purchased the soapstone slabs for the kitchen and laundry room from Soapstone West in Escondido, CA.
• Brazilian Cherry floors have been ordered from Dutko Hardwood Floors in Lawndale, CA and will be installed the first week of December. Talk about a backlog.
• The fireplace mantel has been installed and stained. Plaster will go above it and Moonlight flagstone will go below. It will be cut into manicured blocks of varying size.

Craftsman Mahogany Fireplace Mantel


• Actual work has started on the staircase. There was a lot of planning to get to this point.
• The hot tub has been delivered. We're just waiting for power now.

The hot tub has been slid into place


• The Golden Busckskin flagstone has been installed on the front and back patios.

Golden Bucksking Flagstone has been installed on the patio


• The green slate has been installed on the balconies.
• Paint samples are all over the walls. I hear they will start within 2 weeks with the paint.

Paint samples are on the walls


• Interior doors are installed and stained.

Interior Craftsman door with Delta glass

Add/Review Comments (4)


Fireplace Construction Starts

Pete Ramage of Ramage Masonry has started the fireplaces and the plumber, Jaime, is putting in the gas lines to them.


Add/Review Comments


Start Demolition

With our temporary demo permit in place, we can start demolition. Now we aren't planning on tearing the entire house down but rather save as much as we can and do a minimal amount of changes. A full set of pictures with captions can be seen in the Photo Gallery.


Fireplace Demolition
The brick fireplace was just demolished.

Add/Review Comments


Next Page

Be sure to browse the 2,000 picture Photo Gallery for more step-by-step construction details.