TIMELINE
Architect Selection - December 2002 through January 2003
Getting a Permit - January 2003 through November 2004
Construction - November 2004 through September 2006
Post Construction - October 2006 through ???
Patio Poured, Ordered Door, Interior Design Starting
Mon, May 9 2005 03:25 PM
| Bungalow, Construction, Craftsman, Door, Greene, Remodel, Shingles, Stickley, Stone
| Permalink
• The patio was poured.
• All doors are now installed except for the front door (being built) and the side door (just ordered it). The side door is made by TM Cobb. It is a Stickley model with a mantel from the Greene door.
• All doors are now installed except for the front door (being built) and the side door (just ordered it). The side door is made by TM Cobb. It is a Stickley model with a mantel from the Greene door.
Edited October 29, 2005: The actual door interior and exterior.
• Hose bib locations have been identified.
INTERIOR DESIGN STARTING
I had no idea that I was going to be designing the interior of this house on the fly.
• Spent the last few days identifying all lighting that was not on the original plans. This includes wall sconces inside and outside.
• Roughly laid out the beam design separating the living room and dining room.