Note: Since completion of the house I have also decided to allow guest bloggers to post articles related to remodeling. This continues the education process.
TIMELINE
Architect Selection - December 2002 through January 2003
Getting a Permit - January 2003 through November 2004
Construction - November 2004 through September 2006
Post Construction - October 2006 through ???
The Finishes are Going In
• The master bathroom has been tiled and looks great!
• Cherry cabinets have been installed in the kitchen, master bath, and laundry room. Unfortunately, the kitchen sink cabinet was 3/4" off center from the window. The cabinet had to be shortened by 3/4" on both ends to keep it symmetric and centered on the window.
• I have purchased the soapstone slabs for the kitchen and laundry room from Soapstone West in Escondido, CA.
• Brazilian Cherry floors have been ordered from Dutko Hardwood Floors in Lawndale, CA and will be installed the first week of December. Talk about a backlog.
• The fireplace mantel has been installed and stained. Plaster will go above it and Moonlight flagstone will go below. It will be cut into manicured blocks of varying size.
• Actual work has started on the staircase. There was a lot of planning to get to this point.
• The hot tub has been delivered. We're just waiting for power now.
• The Golden Busckskin flagstone has been installed on the front and back patios.
• The green slate has been installed on the balconies.
• Paint samples are all over the walls. I hear they will start within 2 weeks with the paint.
• Interior doors are installed and stained.
Garage Door Installed, Interior Primed, Bathroom Floated, Ceiling Beams Installed
• All interior doors have been ordered but we have to wait about a month. Expected delivery is 9/14/05.
• The garage door was installed.
• Interior of house and garage has had two coats of primer applied.
• Master bathroom has been floated and is ready for tile.
• The ceiling beams are being installed single-handedly by Dave Barlow. The planning for this was extremely difficult as there is quite a bit of wood and detail in a Craftsman style house. We are designing the layouts on the fly for the ceiling, crown moulding, plate/picture rail, floor trim, wainscoting, and staircase. All of these pieces tie together as one entire wood 'system'. Our design of this is staying about one or two steps ahead of the build. One problem is that we don't have our wood floors in yet so we can't build the jambs up from the floor.
Camera Broken, Drywall Taped and Sanded, Starting Staircase, Siding Complete
• Drywall is sanded and just about ready for primer.
• Dave Barlow is working the staircase and will be doing other fine carpentry in the house. He is creating mockups of everything out of MDF (fiberboard) prior to cutting the real wood.
• All shingle and stone siding is installed.
Staircase Design a No Go
Shingle Siding, Drywall Inspection, and Stone Siding
• Drywall inspection is tomorrow.
• Stone siding starts to go up this week.
Exterior House Work, Shingles May Be Too Colorful
• The water table was installed. This separates the shingle siding from the stone base.
• Window trims are being installed.
• The drywall is almost complete. Inspection of the screws should take place this week with taping to follow.
• MAJOR ISSUE! The shingle siding is being installed and the color variation is a bit more than expected. On its own, it looks great but when the stone siding is added it may be too busy. We called Cabot Stains and asked them what we could do and they said we have to wait 1 year before we attempt to paint a different color stain on it. Oh well, live and learn.
Survey Says...Move the Fence!
• Today I went to the neighbor over my backyard fence to inform her that a survey was done and the fence needs to move about 10 feet onto her side. She said do whatever I need to do. Now wasn't that nice? I told her I'll landscape her side of the fence.
• The roofer has started to cover the black paper with a rough asphalt paper.
• The front door jamb has been installed.
Cabinets, Plumbing, Electrical, Insulation, Surround Sound, Roof Work, Shower Mopped,.....
• All plumbing and electrical in the master bathroom has to shift to the left by about a foot since we had a designer lay out the cabinets.
• All insulation has been put in.
• I installed in-ceiling speaker brackets for surround sound in the living room.
• Copper flashing is going on the roof.
• The shower has been hot-mopped. We were told to pick out all bathroom tile and balcony and laundry room flooring this week.
• Skylights have been framed.
• The Thermador range and Thermador dishwasher were delivered last week. I found a place in Alabama (Fredrickson's Tire and Appliance) with amazing prices through eBay. They were clearing out a supply of Thermador appliances from a warehouse that closed down. They bought everything up and were liquidating at wholesale prices.
• With the extended garage roof you now hit your head when walking around the corner. So, we dug down about 2 feet around the garage to lower the grade.
Low Voltage Wiring, Electrical, Plumbing, Garage Door Ordered, Issues in the Kitchen
• There is still quite a bit to do before inspection. We had a telecom installer come out and install phone (Cat 5), cable TV (RG6), and Ethernet (Cat 6). There was about 1700 feet of ethernet wiring installed. It's easier to put it in now than later. For example, it's behind TVs, in the kitchen, etc. I won't be using it but in 10 years or so it may be needed for home automation purposes. It's also a good selling point if I ever go down that path.
• Wall sconces have been wired.
• Plumbing is almost complete. Just finishing up the gas lines.
• The garage door has been ordered from Designer Doors. This is going to be really nice!
• Issues continue to test my patience in the kitchen. There are so many wires, pipes, and ducts running through the ceiling that we are having trouble figuring out how to get a 10" duct from the range hood over about 10" off center to fit between two joists and vent out the wall.
• The ceiling beam patterns are a challenge since we decided to add the kitchen into the remodeling mix. We decided to stop the ceiling beams at the boundary between the kitchen and dining room so the living and dining rooms only have beams. Kitchen ceiling is TBD.
• The remaining part of the block wall on the rear patio was cut down yesterday.
Disaster Strikes My iPhoto Database
Stay tuned...
Next Page
Be sure to browse the 2,000 picture Photo Gallery for more step-by-step construction details.