Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0068.JPG
Fri, May 27, 2005
DSCN0069.JPG
Fri, May 27, 2005
DSCN0070.JPG
Fri, May 27, 2005
Office wiring and powder room vent. Office wiring and plumbing vent for kitchen sink & dishwasher.
DSCN0071.JPG
Fri, May 27, 2005
DSCN0073.JPG
Fri, May 27, 2005
DSCN0074.JPG
Fri, May 27, 2005
Electrical in the office. Northwest wall. The upstairs heating unit is in a crawl space above the arch. The white pipe is the central vacuum line.
DSCN0075.JPG
Fri, May 27, 2005
DSCN0076.JPG
Fri, May 27, 2005
DSCN0077.JPG
Fri, May 27, 2005
The upstairs electrical sub-panel. In the closet looking towards the master bath. The white pipe on the left is the central vacuum. I like those angled lights in the vaulted ceiling.
DSCN0080.JPG
Fri, May 27, 2005
DSCN0002.JPG
Sat, Jun 4, 2005
DSCN0003.JPG
Sat, Jun 4, 2005
Vent pipe. This is the pipe where the water will first overflow if the system backs up. The outlet will power the spa tub. Office insulation Office insulation. See how the powder room vent turns at the top of the wall and continues along the ceiling?
DSCN0004.JPG
Sat, Jun 4, 2005
DSCN0005.JPG
Sat, Jun 4, 2005
DSCN0006.JPG
Sat, Jun 4, 2005
Insulation above stairs looking towards walk-in closet. Insulation above stairs looking towards walk-in closet. Insulation above dormer in master bedroom. We're still waiting for the dormer windows.
DSCN0007.JPG
Sat, Jun 4, 2005
DSCN0008.JPG
Sat, Jun 4, 2005
DSCN0009.JPG
Sat, Jun 4, 2005
Insulation in walk-in closet. Back of the electrical sub-panel. Ventilation duct. Insulation in living room. The yellow string is marking the position of the future beams. Insulation in dining room.
DSCN0010.JPG
Sat, Jun 4, 2005
DSCN0013.JPG
Sat, Jun 4, 2005
DSCN0007.JPG
Fri, Jun 17, 2005
A joist in the kitchen was moved over to make room for a 10" duct for the range vent. The white central vacuum pipe was cut. Notice the two lights that will hang down over the counter on the right. Insulation in the kids' bedroom (old master). The gray panel on the left is the back of the master electrical panel. This is a 2 foot square skylight in the main entryway.
DSCN0008.JPG
Fri, Jun 17, 2005
DSCN0010.JPG
Fri, Jun 17, 2005
DSCN0011.JPG
Fri, Jun 17, 2005
The insulation is in and around the lights and speaker brackets. All electrical wiring is now in place in the living room. The built-in entertainment center will go here. A recessed ironing board is in the walk-in closet.
DSCN0003.JPG
Mon, Jun 20, 2005
DSCN0004.JPG
Mon, Jun 20, 2005
DSCN0005.JPG
Mon, Jun 20, 2005
The bundle of wires is for TV, phone, and internet to the house. In the corner are central vacuum and tankless water heater hookups. The wires will be installed into patch panels about 5-6 feet above the ground. The pipe in the top of the wall is the central vac line into the house.
DSCN0009.JPG
Mon, Jun 20, 2005
DSCN0010.JPG
Mon, Jun 20, 2005
DSCN0011.JPG
Mon, Jun 20, 2005
The office drywalling starts. Office looking towards the street. This monster fan in the master bath will suck out any steam from the shower in seconds.



Last updated: 3/2/06