Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

IMG_0230.JPG
Thu, Aug 11, 2005
IMG_0252.JPG
Thu, Aug 25, 2005
IMG_0253.JPG
Thu, Aug 25, 2005
The office is ready to be primed. The garage is freshly painted. You can see that the garage door is installed and just needs to be plugged in. The ceiling pattern was painted over. Next step is to put in the beams.
IMG_0254.JPG
Thu, Aug 25, 2005
IMG_0255.JPG
Sun, Aug 28, 2005
IMG_0256.JPG
Sun, Aug 28, 2005
The ceiling beams will not be in the kitchen; they are only in the dining room and stop at the border. The beams join together at a point. The wood strips are a sub structure to support the beams.
IMG_0257.JPG
Sun, Aug 28, 2005
IMG_0258.JPG
Sun, Aug 28, 2005
IMG_0259.JPG
Sun, Aug 28, 2005
A sample of what the beam will look like. See how the sides hang down past the bottom. All of the mahogany for the interior trim. Looking towards the dining room from the kitchen.
IMG_0260.JPG
Sun, Aug 28, 2005
IMG_0273.JPG
Fri, Sep 2, 2005
IMG_0274.JPG
Fri, Sep 2, 2005
The pencil sketch is how I described what I want this to look like. Dave Barlow is single-handedly building the entire ceiling and does great detailed, finish work. The wood is hand-picked to match the grains and color for adjoining pieces. The bottom pieces are put in first; glued and toe-nailed. Once dry, the sides are put in.
IMG_0277.JPG
Fri, Sep 2, 2005
IMG_0294.JPG
Thu, Sep 8, 2005
IMG_0295.JPG
Thu, Sep 8, 2005
The recess in the wall is 2 feet tall and fills the space betwen the studs. The glass shower door/wall will follow the edge of the cement line up the wall and the ceiling.
IMG_0647.JPG
Tue, Oct 4, 2005
IMG_0648.JPG
Tue, Oct 4, 2005
IMG_0649.JPG
Tue, Oct 4, 2005
The first cabinets arrived in the master bathroom. The cabinets are made of American Cherry. Look closely at the center of the toe kick. There is a rectangle cut in there for the electric heater. All that is left is the ceiling and floor. The ceiling has to be done because it is a steam shower and will be completely sealed.
IMG_0655.JPG
Sat, Oct 8, 2005
IMG_1394.JPG
Sat, Oct 29, 2005
IMG_1395.JPG
Sat, Oct 29, 2005
We ran out of tile for the shower ceiling. Upper kitchen cabinets above the range. Kitchen cabinets
IMG_1396.JPG
Sat, Oct 29, 2005
IMG_1397.JPG
Sat, Oct 29, 2005
IMG_1398.JPG
Sat, Oct 29, 2005
The sink cabinet is off to the right by 3/4". The missing cabinet is having 3/4" taken off the side. The peninsula will stay at the same height as the rest of the counters.
IMG_1399.JPG
Sat, Oct 29, 2005
IMG_1401.JPG
Sat, Oct 29, 2005
IMG_1402.JPG
Sat, Oct 29, 2005
There will be a lazy susan in the corner. Cabinets above the range and housing the refrigerator. The Sub Zero refrigerator will slide in here.
IMG_1403.JPG
Sat, Oct 29, 2005
IMG_1404.JPG
Sat, Oct 29, 2005
IMG_1405.JPG
Sat, Oct 29, 2005
Dave is working on those stair posts. The cherry cabinets butt into the mahogany ceiling beams. The mantel has been stained.