Craftsman Remodel - Electrical page 6


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

IMG_1406.JPG
Sat, Oct 29, 2005
IMG_1407.JPG
Sat, Oct 29, 2005
IMG_1411.JPG
Sat, Oct 29, 2005
The side posts have been built. The top piece is removable so we can get at the electrical box inside. Master bathrrom cherry cabinets.
IMG_1413.JPG
Sat, Oct 29, 2005
IMG_1417.JPG
Sat, Oct 29, 2005
IMG_1420.JPG
Sat, Oct 29, 2005
Two copper sinks are waiting to be put in. The grout joint looks too big at the ceiling. We need to do something about it. 2 wall sconces will come out of the plate rail.
IMG_1421.JPG
Sat, Oct 29, 2005
IMG_1422.JPG
Sat, Oct 29, 2005
IMG_1429.JPG
Sat, Oct 29, 2005
Electric toe kick heater. The upstairs fireplace is being prepped for floating. The gym is getting very colorful. We're having a lot of time picking out a color.
IMG_1434.JPG
Sat, Oct 29, 2005
IMG_1519.JPG
Fri, Nov 11, 2005
IMG_1520.JPG
Fri, Nov 11, 2005
This outlet will have to be remotely mounted to the outside of the cabinet. With the sinks in, we are now ready to float the countertop for the seagrass limestone tile. It's the same tile that's on the floor. Dave Barlow works on the mahogany beam in the master bedroom.



Last updated: 11/13/05