Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.
Sat, Sep 17, 2005
|
Sat, Sep 17, 2005
|
Sat, Sep 17, 2005
|
The hot tub enclosure. |
Steps will wrap around the curved part. |
See the slope. Some dirt will be brought in to flatten it out some. |
Sat, Sep 17, 2005
|
Sat, Sep 17, 2005
|
Sat, Sep 17, 2005
|
The hot tub slides in and will be about 1 foot higher than the block wall. On either side, stairs will go down to the lawn. |
A lot of stone work has been done so far. You can see the remnants on the ground. |
We're still trying to figure out what to do with the transition from the stairs to the wall on the right. |
Thu, Oct 13, 2005
|
Thu, Oct 13, 2005
|
Thu, Oct 13, 2005
|
You can see how much we lowered the grade. Now I won't hit my head on the roof. |
We have to dig 6 feet down only 2 feet away from the utility pole. |
|
Thu, Oct 13, 2005
|
Thu, Oct 13, 2005
|
Thu, Oct 13, 2005
|
|
The brick wall will be removed and a true retaining wall will be built in its place. The utility pole needs to be anchored before digging. |
The back patio surface is complete. We used Golden Buckskin flagstone. |
Thu, Oct 13, 2005
|
Thu, Oct 13, 2005
|
Thu, Oct 13, 2005
|
The stairs have been poured and now need stone. |
The tree looks good in here. |
Digging for the sewer pipe. |
Fri, Nov 11, 2005
|
Fri, Nov 11, 2005
|
Fri, Nov 11, 2005
|
The brick wall in the front yard is being removed to make way for a new retaining wall. |
Removing dirt on the North side of the house using a pick and a shovel. Back-breaking work! |
The telephone pole needs to be anchored before we dig the corner out. |
Tue, Nov 15, 2005
|
Wed, Dec 21, 2005
|
Wed, Dec 21, 2005
|
Looking over the hot tub at the north wall. The only tree left in the backyard is the orange tree. |
We need to anchor the telephone pole prior to digging the dirt out around it for a retaining wall. |
Removal of the old brick wall starts so we can install a real retaining wall. |
Fri, Dec 23, 2005
|
Fri, Dec 23, 2005
|
Fri, Dec 23, 2005
|
Forming up the retaining wall. |
|
Rich is verifying the depth of the hole. It has to go 18" into the bedrock. |
Fri, Dec 23, 2005
|
Fri, Dec 23, 2005
|
Fri, Dec 23, 2005
|
As you can see we are 2 feet into the bedrock. |
Rich wants these pictures to prove the depth in case the inspector asks. |
|
Fri, Dec 23, 2005
|
Fri, Dec 23, 2005
|
Fri, Dec 23, 2005
|
|
Front yard retaining wall. |
The corner of the wall will be dug out after the sides are poured. This is to minimize stress on the telephone pole. |