Craftsman Remodel - Foundation page 2


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0108.JPG
Fri, Nov 5, 2004
DSCN0109.JPG
Fri, Nov 5, 2004
DSCN0002.JPG
Sun, Nov 14, 2004
Filling the gaps underneath the future fireplace. Starting a trench down the South side of the house for the foundation reinforcement.
DSCN0011.JPG
Sun, Nov 14, 2004
DSCN0012.JPG
Sun, Nov 14, 2004
DSCN0013.JPG
Sun, Nov 14, 2004
The gaps in the original concrete pour have been filled in. Now it's one massive wall. What's interesting is the living room wall is moving out 7 feet and a new foundation needs to be done there. Let's see what happens. The 2x4 braces and wire keep the form from collapsing under the weight of the concrete.
DSCN0014.JPG
Sun, Nov 14, 2004
DSCN0015.JPG
Sun, Nov 14, 2004
DSCN0017.JPG
Sun, Nov 14, 2004
Our sewer line was uncovered outside the dining room. There is so much root infestation that new pipes will have to be laid. Another view of the trench on the South side. Annie in the dining room.
DSCN0018.JPG
Sun, Nov 14, 2004
DSCN0019.JPG
Sun, Nov 14, 2004
DSCN0020.JPG
Sun, Nov 14, 2004
Annie playing with Chinook in the dining room. All that's needed is to remove the wood forms.
DSCN0003.JPG
Sun, Nov 21, 2004
DSCN0004.JPG
Sun, Nov 21, 2004
DSCN0101.JPG
Wed, Nov 24, 2004
What a mess! We had a good rain storm and the trench filled in with a few inches of water. Preparing for the underpinnings on the South side of the house. Remember the rear patio foundation? It has now been backfilled with dirt.
DSCN0102.JPG
Wed, Nov 24, 2004
DSCN0103.JPG
Wed, Nov 24, 2004
DSCN0105.JPG
Wed, Nov 24, 2004
Another view of the backfilling. That hole in the floor is where the chimney was. A good view of digging under the existing foundation for the underpinnings. Dig a section, pour a section, then repeat. This water just won't dry up.
DSCN0106.JPG
Wed, Nov 24, 2004
DSCN0004.JPG
Fri, Dec 3, 2004
DSCN0005.JPG
Fri, Dec 3, 2004
Notice where the dirt stops and the bedrock starts. The reinforcements have to go not only under the existing foundation but down into the bedrock. South side foundation forms
DSCN0006.JPG
Fri, Dec 3, 2004
DSCN0007.JPG
Fri, Dec 3, 2004
DSCN0008.JPG
Sat, Dec 4, 2004
Worker sleeping in hammock. OK, it was his lunch break. :) North side foundation trench
DSCN0009.JPG
Sat, Dec 4, 2004
DSCN0010.JPG
Sat, Dec 4, 2004
DSCN0011.JPG
Sat, Dec 4, 2004
It looks like a war zone out here. We are trying to save this tree.
DSCN0012.JPG
Sat, Dec 4, 2004
DSCN0035.JPG
Mon, Dec 6, 2004
DSCN0036.JPG
Mon, Dec 6, 2004
Chinook's new litter box. We had a lot of rain yesterday. Part of the trench wall broke free and fell in. In a few days this part will have to be dug out.



Last updated: 3/2/06