Craftsman Remodel - Windows & Doors page 3


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0031.JPG
Thu, Apr 28, 2005
DSCN0037.JPG
Thu, Apr 28, 2005
DSCN0041.JPG
Thu, Apr 28, 2005
East side of the office. Not all windows are installed yet. We're still waiting for the shed dormer windows. Installing flashing to protect the wood from moisture. When stone is installed, the patio will be flush with the interior floor.
DSCN0043.JPG
Thu, Apr 28, 2005
DSCN0057.JPG
Sat, Apr 30, 2005
DSCN0048.JPG
Sun, May 15, 2005
Starting to put bituthane over the living room french door threshold. Laundry room plumbing An updated front view with the completed garage.
DSCN0022.JPG
Sun, May 22, 2005
DSCN0023.JPG
Sun, May 22, 2005
DSCN0036.JPG
Fri, May 27, 2005
I just liked this angle. It looks really cool.
DSCN0037.JPG
Fri, May 27, 2005
DSCN0040.JPG
Fri, May 27, 2005
DSCN0041.JPG
Fri, May 27, 2005
The central vacuum line will extend out under the cabinet to a toe-kick vacuum opening. Sweep to the end of the cabinet and press a button. Left side of fireplace in living room with gas lines installed to the patio fireplace.
DSCN0048.JPG
Fri, May 27, 2005
DSCN0059.JPG
Fri, May 27, 2005
DSCN0060.JPG
Fri, May 27, 2005
DSCN0066.JPG
Fri, May 27, 2005
DSCN0068.JPG
Fri, May 27, 2005
DSCN0069.JPG
Fri, May 27, 2005
Central vacuum at the top of the stairs. Office wiring and powder room vent. Office wiring and plumbing vent for kitchen sink & dishwasher.
DSCN0071.JPG
Fri, May 27, 2005
DSCN0073.JPG
Fri, May 27, 2005
DSCN0004.JPG
Mon, May 30, 2005
Electrical in the office. Northwest wall. The upstairs heating unit is in a crawl space above the arch. Mockup of a potential window trim design.
DSCN0005.JPG
Mon, May 30, 2005
DSCN0006.JPG
Mon, May 30, 2005
DSCN0002.JPG
Sat, Jun 4, 2005
We ended up staying with a straight line instead of the dovetail. Olympia said the Art Jury would not approve anything other than that. The boards are showing the trim sizes around the window. Office insulation
DSCN0003.JPG
Sat, Jun 4, 2005
DSCN0006.JPG
Sat, Jun 4, 2005
DSCN0009.JPG
Sat, Jun 4, 2005
Office insulation. See how the powder room vent turns at the top of the wall and continues along the ceiling? Insulation above dormer in master bedroom. We're still waiting for the dormer windows. Insulation in dining room.
DSCN0012.JPG
Sat, Jun 4, 2005
DSCN0002.JPG
Fri, Jun 17, 2005
DSCN0009.JPG
Fri, Jun 17, 2005
Insulation in the kids' bedroom (old master). It's coming together. The front door jamb is now ready for the door. The cat door framing has been added in the laundry room.



Last updated: 3/3/06