Craftsman Remodel - Windows & Doors page 5


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0004.JPG
Wed, Jul 27, 2005
DSCN0005.JPG
Wed, Jul 27, 2005
DSCN0007.JPG
Wed, Jul 27, 2005
Putting the shingles on the roof. The wood shakes are fire treated. We ran out of siding with one wall to go. It should be done in a few days.
DSCN0010.JPG
Wed, Jul 27, 2005
DSCN0011.JPG
Wed, Jul 27, 2005
DSCN0012.JPG
Wed, Jul 27, 2005
Finishing up the stone on the upper chimney. The blank white space will be cedar siding. Can you spot the hole for the electrical outlet? It's on the right side of the stone next to the fireplace. We're almost ready to cover the vertical posts.
DSCN0014.JPG
Wed, Jul 27, 2005
IMG_0207.JPG
Thu, Aug 11, 2005
IMG_0208.JPG
Thu, Aug 11, 2005
The shed dormer windows finally came in and were installed. The speaker wire coming out of the wall was moved about a fit to match the wire coming out of the other wall. The exterior is complete except for the white post. The front door is mahogany and has 4 clear coats on it.
IMG_0209.JPG
Thu, Aug 11, 2005
IMG_0210.JPG
Thu, Aug 11, 2005
IMG_0211.JPG
Thu, Aug 11, 2005
The garage door is made of two types of mahogany, each with 4 clear coats. See the cloud-relief detail in the door panel. The side door at the laundry room. See the cat door in the lower left?
IMG_0212.JPG
Thu, Aug 11, 2005
IMG_0213.JPG
Thu, Aug 11, 2005
IMG_0214.JPG
Thu, Aug 11, 2005
Only the balcony railing is left on the house. A full shot of the rear of the house. Rear bedroom with the sklight installed.
IMG_0219.JPG
Thu, Aug 11, 2005
IMG_0220.JPG
Thu, Aug 11, 2005
IMG_0225.JPG
Thu, Aug 11, 2005
An oversized opening for the skylight in the library. We laid out the ceiling beam pattern using multi-density fiberboard (MDF)before cutting the actual wood. I'm standing between the living room and dining room.
IMG_0227.JPG
Thu, Aug 11, 2005
IMG_0228.JPG
Thu, Aug 11, 2005
IMG_0229.JPG
Thu, Aug 11, 2005
The laundry room was floated today. This douglas fir door needs to be stained.
IMG_0230.JPG
Thu, Aug 11, 2005
IMG_0232.JPG
Thu, Aug 11, 2005
IMG_0233.JPG
Thu, Aug 11, 2005
The office is ready to be primed. The master bathroom floor was floated today. Once the floor dries, the black paper will be floated.
IMG_0235.JPG
Thu, Aug 11, 2005
IMG_0252.JPG
Thu, Aug 25, 2005
IMG_0254.JPG
Thu, Aug 25, 2005
The front door from the inside. The garage is freshly painted. You can see that the garage door is installed and just needs to be plugged in. The ceiling beams will not be in the kitchen; they are only in the dining room and stop at the border.
IMG_0259.JPG
Sun, Aug 28, 2005
IMG_0275.JPG
Fri, Sep 2, 2005
IMG_0385.JPG
Sat, Sep 17, 2005
Looking towards the dining room from the kitchen. Tile will go up to the base of the window and over to the cabinets. Patio layout outside the bedroom.



Last updated: 3/3/06