Craftsman Remodel - Framing page 10


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0078.JPG
Fri, May 27, 2005
DSCN0079.JPG
Fri, May 27, 2005
DSCN0080.JPG
Fri, May 27, 2005
A cabinet will go up here to support Mr. Steam. All of the plumbing and electrical needs to shift left. Vent pipe. This is the pipe where the water will first overflow if the system backs up. The outlet will power the spa tub.
DSCN0081.JPG
Fri, May 27, 2005
DSCN0007.JPG
Mon, May 30, 2005
DSCN0005.JPG
Fri, Jun 17, 2005
The master bath shower layout was tweaked several times. I like the look of the rafter tails in the corner. The skylight in the library is flared out from the roof to the ceiling. The cross-section is a trapezoid shape.
DSCN0006.JPG
Fri, Jun 17, 2005
DSCN0007.JPG
Fri, Jun 17, 2005
DSCN0008.JPG
Fri, Jun 17, 2005
Another view of the library skylight. This is a 2 foot square skylight in the main entryway. The insulation is in and around the lights and speaker brackets.
DSCN0010.JPG
Fri, Jun 17, 2005
DSCN0015.JPG
Mon, Jun 20, 2005
DSCN0010.JPG
Fri, Jul 1, 2005
All electrical wiring is now in place in the living room. The built-in entertainment center will go here. Finishing touches on the stairs. The wood triangle shape makes the stairs flow into the ceiling. The entire master bathroom is covered in fire rated drywall.
DSCN0003.JPG
Thu, Jul 14, 2005
The corner of the garage. See how everything is strapped together for added stiffness.



Last updated: 11/13/05