Craftsman Remodel - Framing page 7


Click any picture to supersize it. Sorted by date. To see the latest pictures start at the last page and work your way backwards.

DSCN0006.JPG
Tue, Apr 19, 2005
DSCN0008.JPG
Tue, Apr 19, 2005
DSCN0009.JPG
Tue, Apr 19, 2005
Vent pipes for the downstairs bathroom. Looking down the roof ridgeline from the top of the stairs. This is where we changed the roof so it looks like one continous surface.
DSCN0010.JPG
Tue, Apr 19, 2005
DSCN0011.JPG
Sat, Apr 23, 2005
DSCN0012.JPG
Sat, Apr 23, 2005
A lone peacock on top of the house. The sheeting has started on the roof.
DSCN0013.JPG
Sat, Apr 23, 2005
DSCN0014.JPG
Sat, Apr 23, 2005
DSCN0015.JPG
Sat, Apr 23, 2005
Barge rafters installed. The bay window needs to be removed. The garage framing is complete. See how the foundation steps down. That explains the wood rot since the dirt was above that level.
DSCN0016.JPG
Sat, Apr 23, 2005
DSCN0017.JPG
Sat, Apr 23, 2005
DSCN0018.JPG
Sat, Apr 23, 2005
All of the cabinets will have to be removed due to exposure to the cheap particle board they were made of. Laying the barge rafters over the front patio.
DSCN0019.JPG
Tue, Apr 26, 2005
DSCN0020.JPG
Tue, Apr 26, 2005
DSCN0021.JPG
Tue, Apr 26, 2005
View looking straight down the garage ridge. I was looking at the proportions compared to the window and roof above. Another view of the front showing an almost complete roof. Balcony waterproofing threshold being installed.
DSCN0022.JPG
Tue, Apr 26, 2005
DSCN0025.JPG
Tue, Apr 26, 2005
DSCN0026.JPG
Tue, Apr 26, 2005
The front roof during sheeting. Remember the bay window here?
DSCN0027.JPG
Thu, Apr 28, 2005
DSCN0028.JPG
Thu, Apr 28, 2005
DSCN0029.JPG
Thu, Apr 28, 2005
The west end of the office. South wall of the office. The outlet on the left is where I want to put a pinball machine. The plumbing vent is from the kitchen below. Hot & cold lines and a drain are between the studs to the right just under the floor. This is in case anyone wants to turn this into 2 rooms with a Jack & Jill bathroom.
DSCN0030.JPG
Thu, Apr 28, 2005
DSCN0031.JPG
Thu, Apr 28, 2005
DSCN0032.JPG
Thu, Apr 28, 2005
The cans on either side of the ridge are separately controlled. East side of the office. Not all windows are installed yet. Northwest side of the office.
DSCN0033.JPG
Thu, Apr 28, 2005
DSCN0034.JPG
Thu, Apr 28, 2005
DSCN0035.JPG
Thu, Apr 28, 2005
Top of the stairs looking towards the office. The chimney is almost complete.
DSCN0036.JPG
Thu, Apr 28, 2005
DSCN0037.JPG
Thu, Apr 28, 2005
DSCN0038.JPG
Thu, Apr 28, 2005
The hole was originally cut for the heating duct but it turns out the duct is being run outside the bedroom on the left side of the wall on the left. We're still waiting for the shed dormer windows. The upstairs electrical sub-panel will go here.